A key road in Gandhinagar to remain shut for traffic till Sept 17 due to Metro project works
August 18, 2024
Gandhinagar: Due to steel girder and deck slab works by Gujarat Metro Rail Corporation(GMRC) for Metro rail project, Ch 2 circle to Ch 3 circle road and sector 7/8 side road will be closed for all kinds of traffic till September 17. As per the public notification issued today, commuters will need to use alternate route.
As per notification, the road to Ch-3 circle from sector 7/8 cut will remain shut. Alternative route shall be through sector7 and then to Gh road to sector7. Similarly Ch2 circle to Ch3 circle road will also remain shut. Alternate route shall be through sector11 petrol pump cut to Skyline building and to the sector 7. DeshGujarat
Recent Stories
- PM Modi proposes Thiru CP Radhakrishnan Ji's nomination for the Vice President
- India operates 24 nuclear power reactors with 8,180 MW capacity: Centre
- Closure of Tapi Bridge on Ahmedabad–Mumbai Highway Extended till Aug 20
- Pakistani Mohalla in Surat renamed to Hindustani Mohalla
- Multiple rounds of heavy rains likely in Saurashtra, Kutch, during 16-23 August: Weather analyst
- NHAI Rolls Out FASTag Annual Pass; List of Eligible Toll Plazas in Gujarat
- PM Modi announces Mission Sudarshan Chakra; aims to boost national security shield by 2035