Petronet LNG to set up a PSA hydrogen plant at Dahej in Gujarat
April 02, 2025
Dahej: Petronet LNG Limited (PLL) has invited bids for the procurement of a Pressure Swing Adsorption (PSA) hydrogen plant for its Propane Dehydrogenation (PDH) and Polypropylene (PP) plant at Dahej, Gujarat. The project, which also includes ethane and propane handling facilities, aims to strengthen India’s petrochemical sector by enhancing domestic production and reducing dependence on imports.
Engineers India Limited (EIL) has been appointed as the consultant for the development of the 750 KTA PDH plant and the 500 KTA PP plant at the Dahej petrochemical complex. Bidders with proven technical and financial capabilities are invited to submit e-bids under a single-stage, two-bid system, in accordance with the specifications outlined in the bidding documents.
The deadline for bid submission is May 8, 2025. The techno-commercial (unpriced) bids will be opened on May 9, 2025, at 2:00 PM (IST), while the priced bids will be opened at a later date, which will be communicated to the qualified bidders. DeshGujarat
Recent Stories
- PM Modi proposes Thiru CP Radhakrishnan Ji's nomination for the Vice President
- India operates 24 nuclear power reactors with 8,180 MW capacity: Centre
- Closure of Tapi Bridge on Ahmedabad–Mumbai Highway Extended till Aug 20
- Pakistani Mohalla in Surat renamed to Hindustani Mohalla
- Multiple rounds of heavy rains likely in Saurashtra, Kutch, during 16-23 August: Weather analyst
- NHAI Rolls Out FASTag Annual Pass; List of Eligible Toll Plazas in Gujarat
- PM Modi announces Mission Sudarshan Chakra; aims to boost national security shield by 2035