Construction of rubber barrage-cum-bridge over Sabarmati River begins
November 27, 2024
Ahmedabad: The construction of a 6-lane rubber barrage bridge over the Sabarmati River has begun. The 1 km dual-purpose bridge and rubber barrage will link Acher, near the Torrent Powerhouse on the west bank, and Sadar Bazar on the east bank of the Sabarmati River. The total cost of constructing the bridge is approximately ₹367 crore.
The bridge is expected to alleviate traffic congestion, providing a crucial link between key areas such as Chandkheda, Sabarmati, Motera, Hansol, and the airport. In addition to its transportation benefits, the barrage will serve as a water reservoir, capable of supplying uninterrupted water to the city of Ahmedabad for 12-15 days.
The structure of the barrage, which will be built under the bridge, will be made of rubber. The height of the rubber barrage can be adjusted as needed. During monsoon and flood conditions, the rubber barrages will be lowered completely, allowing excess water from upstream in the Sabarmati River to pass without causing damage to the city. DeshGujarat
Related Stories
Recent Stories
- PM Modi proposes Thiru CP Radhakrishnan Ji's nomination for the Vice President
- India operates 24 nuclear power reactors with 8,180 MW capacity: Centre
- Closure of Tapi Bridge on Ahmedabad–Mumbai Highway Extended till Aug 20
- Pakistani Mohalla in Surat renamed to Hindustani Mohalla
- Multiple rounds of heavy rains likely in Saurashtra, Kutch, during 16-23 August: Weather analyst
- NHAI Rolls Out FASTag Annual Pass; List of Eligible Toll Plazas in Gujarat
- PM Modi announces Mission Sudarshan Chakra; aims to boost national security shield by 2035