70 km electrification on Ahmedabad – Udaipur railway line yet to complete
August 04, 2024
Gandhinagar: The electrification on the broad guage railway line in length of 70 km is yet to complete on Ahmedabad – Udaipur route. Due to lack of end-to-end electrification, the railway connectivity is not as much and as fast as it should be on Ahmedabad – Udaipur route.
Electrification of railway line is must for operating electric engine run trains. It is important to run some premium trains also. For example, two main requirement to launch Vande Bahrat Express on any railway route are – broad guage and electrification of railway line. While Ahmedabad – Udaipur route deserves Vande Bharat Express, it’s not possible till there’s total electrification of this line.
According to Railway Ministry’s reply in ongoing session of Lok Sabha – ‘The electrification of 227 Route km (RKM) out of 297 RKM between Udaipur-Ahmedabad has been completed. The work between Bechhiwara to Himmatnagar (70 RKM) are taken up.’ (note: RKM stands for Raiwlay Kilometers)
The Railways further stated – ‘Expenditure of ₹201.32 crore has been incurred for this project. Necessary funds to complete the project have been provided.’
The statement in reply to a question also added – ‘The completion of Electrification project(s) depends on various factors like forest clearances, right of way for the incoming transmission lines and its commissioning, shifting of infringing utilities, statutory clearances from various authorities, geological and topographical conditions of area, law & order situation in the area of project(s) site, number of working months in a year for particular project site due to climatic conditions etc. All these factors affect the completion time of the project(s).’ DeshGujarat
Related Stories
Recent Stories
- PM Modi proposes Thiru CP Radhakrishnan Ji's nomination for the Vice President
- India operates 24 nuclear power reactors with 8,180 MW capacity: Centre
- Closure of Tapi Bridge on Ahmedabad–Mumbai Highway Extended till Aug 20
- Pakistani Mohalla in Surat renamed to Hindustani Mohalla
- Multiple rounds of heavy rains likely in Saurashtra, Kutch, during 16-23 August: Weather analyst
- NHAI Rolls Out FASTag Annual Pass; List of Eligible Toll Plazas in Gujarat
- PM Modi announces Mission Sudarshan Chakra; aims to boost national security shield by 2035