Adani announces start of power supply to national grid from Khavda Renewable Energy park
February 14, 2024
Bhuj: Adani Green Energy Limited (AGEL), today in a note made announcement that it has operationalized 551 MW solar capacity in Khavda, Gujarat, by supplying power to the national grid. AGEL said it has achieved this within 12 months of commencing work on the Khavda RE park, starting with the development of basic infrastructure, including roads and connectivity, and creating a self-sustaining social ecosystem.
AGEL said it also transformed the barren terrain of the Rann of Kutch into a habitable environment for its 8,000-strong workforce. AGEL further said it plans to develop 30 GW of renewable energy capacity at this RE park. The planned capacity is expected to be operationalized in the next five years. When completed, the Khavda RE park will be the largest renewable energy installation in the world. Energy from the Khavda RE park can power 16.1 million homes each year. DeshGujarat
Related Stories
Recent Stories
- PM Modi proposes Thiru CP Radhakrishnan Ji's nomination for the Vice President
- India operates 24 nuclear power reactors with 8,180 MW capacity: Centre
- Closure of Tapi Bridge on Ahmedabad–Mumbai Highway Extended till Aug 20
- Pakistani Mohalla in Surat renamed to Hindustani Mohalla
- Multiple rounds of heavy rains likely in Saurashtra, Kutch, during 16-23 August: Weather analyst
- NHAI Rolls Out FASTag Annual Pass; List of Eligible Toll Plazas in Gujarat
- PM Modi announces Mission Sudarshan Chakra; aims to boost national security shield by 2035